Suzhou Edgecross Membrane Technology Co., Ltd.
Add: Yangshan Science and Technology Park, 8 Jinyan Road, Suzhou, 25 buildings, 3 floors
Tel: 0512-66901819
Sales contact: Bruce Zhu
Mob: 137-5716-8872 (Wechat with the same number, welcome to add!)
E-mail: zhubin@edgecross.com
In the production process of barium titanate, a stream of ammonia nitrogen wastewater will be produced because of the need of technology. Because there is no carbon source, biochemistry can not be treated; stripping can not meet the standard; stripping, ammonia evaporation, ion exchange operation costs are too high. After investigating various ammonia removal processes, the user finally chose the degassing film process.
Live pictures:
Deamination membrane rack
Ammonium salt, by-product of evaporation crystallization after absorption of ammonia by acid absorption solution of acid side filter